How are schedule constraints related to resource constraints?


Asked by Larry Duke on Dec 01, 2021 FAQ



Schedule Constraints include resource constraints, finance and supply constraints, calendar constraints and imposed dates. The word any here makes the difference: the float should be calculated with all schedule constraints, including those deriving from resource usage, and not only with those deriving from the network sequence logic.
Next,
Certainly, projects in which only an occasional resource constraint exists might be best scheduled starting from a critical path schedule. At the other extreme, projects with numerous important resource constraints might be best scheduled by considering critical resources first.
Likewise, A resource constraint is any limitation and/or risk associated with project resources. Identifying these resource management constraints is part of the project planning phase. Resource constraints are roadblocks that can derail your project and prevent successful delivery. Constraints impact every aspect of the project life cycle.
In addition,
In presenting project duration estimates, it is prudent for a project manager to assess the impact that resource constraints have on expected project duration, task criticality, and task finish time correlation. Resource constrained schedule simulation helps us do this.
Besides,
Project constraints are limiting factors for your project that can impact quality, delivery, and overall project success. Some say there are as many as 19 project constraints to consider, including resources, methodology, and customer satisfaction.